Tidewater Home Improvement LLC
Invoice #335
08/20/2026
27 Booker Street — repair site (bubbled section)
$1,250.00 Invoice
27 Booker Street · Hampton, VA
Siding Repair — Bubbled Section (see photo)
Work scheduled: Friday, August 21, 2026
Print / PDF Pay Online Web copy expires: 08/27/2026
Invoice Overview
Customer: Rob Carey
Invoice #: 335
Address: 27 Booker Street, Hampton, VA
Project: Siding Repair (bubbled section) & Water-Intrusion Investigation
Status: Awaiting final approval (scope updated per discussion)
Payment: 50% deposit · 50% upon completion
Approved Scope — Investigation & Repair
1Remove & Replace Damaged Siding — Bubbled SectionIncluded

Remove and replace the damaged siding at the bubbled section (circled in the photo above). The repair is located at the bubbled section — not under the window.

2Investigate the Water-Intrusion SourceIncluded

Verify the actual source rather than assume. The original contractor believes it may simply need caulking underneath the windowsill — Tidewater will confirm the source instead of assuming that is the only issue.

3Check All Possible SourcesIncluded

Check whether the water could be coming from the window, A/C area, roof/flashing, or another source above or behind the siding.

4Roof / Flashing InspectionIncluded

Inspect the roof and roof flashing in this area for anything that could be contributing to the leak.

5Inspect Exposed Structural WoodIncluded

While the siding is removed, inspect the exposed sheathing, sill, framing, and other visible structural wood for water damage, rot, or deterioration.

6Photos & Video Before CoveringIncluded

Take clear photos and videos of the exposed area before it is covered back up.

7Simple Repair Up to $500 — ProceedPre-approved

If the leak can be corrected with caulking, flashing, sealing, or another relatively simple repair costing $500 or less, the repair is completed without prior approval.

8Repairs Over $500 — Contact FirstApproval required

If additional repairs would exceed $500, or significant damage is found to the sill, framing, sheathing, or other structural components, the customer is contacted with photos and the proposed cost before proceeding.

⛔ No foundation work — the customer's structural engineer is handling the foundation issue separately.
Job Site Photos & Video
📁 View Repair Site Photos & Video
Full visit folder — 5 photos + 4 videos (opens in Google Drive, no login needed)
Payment Schedule — 50 / 50
Deposit — Due on Approval
50%
$625.00
Final — Upon Completion
50%
$625.00 · work 08/21/2026
Invoice Amount
Window Water-Intrusion Investigation & Exterior Siding Repair — 27 Booker Street (scope above)$1,250.00
INVOICE TOTAL$1,250.00
Terms & Conditions

Scope: All work described in the Approved Scope above. Any work not listed is not included unless agreed in writing.

Communication: Photos and video of the exposed area are taken before anything is covered back up. Any repair over $500 or significant structural damage is reported to the customer with photos and proposed cost before proceeding.

Foundation: No foundation work is included — the customer's structural engineer handles the separate foundation issue.

Payment Terms:
· Invoice Total: $1,250.00
· Deposit to Schedule: $625.00 (50%)
· Final Payment: $625.00 (50%) upon completion

**You can pay by credit card using the link below.
https://request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment:
- Amex, Virtual Affirm credit card

Warranty: 12 months workmanship.

Validity: one (1) week from the date above.